More than 500 construction workers at London’s Olympic Park got together to signify two years to the start of the 2012 games.
The staff formed a giant ‘2’ on the F10 Bridge which will be the gateway to the park and is located next to the Aquatics Centre in east London.
While it’s still a large construction site, the £2 billion Olympic Park should be completed by next summer with the 80,000 capacity Olympic Stadium taking centre stage for the 2012 games.